码头 Location:Home > NEWS > PORT
Foshan area - details

SanShan port, "four in one"


According to Foshan Chancheng District Party committee work conference said, Foshan City will speed up the port of Foshan, Lanshi port 2 Port relocation work to ensure that before the end of 2008, the two ports to complete the relocation.

The other according to the Foshan waterway development planning ", in Foshan City is currently scattered layout of port, smaller control logistics development, shoreline resources waste phenomenon, hinder the urban planning, the scale is too small for the port will be merging, relocation, retained the port will be further integrated.

According to the Foshan port Chancheng port (expansion) overall plan, by 2010 to build 1000 tons of container berths, 3 cargo berths, forming a throughput capacity of 400000 TEU (standard container); in 2020 to build 1000 - 2000 tons of professional container berths 9, cargo berths 6, forming a throughput capacity of 450000 TEU. At the same time, according to "a river" center of Foshan City Planning Group, Chancheng District existing Lanshi port, Xinshi port and Shiwan port will be integrated to Chancheng port.

   According to the plan, by 2008, Lan Shi Hong, the port of Foshan, Foshan car market will move to built the Chancheng port, Chancheng port will become Foshan important modern port logistics base.

It is reported that planning Chancheng port is located in the Shunde waterway in the upper reaches of the purple hole to Nanzhuang River, total length of the coastline of a port is 1710 meters is Chancheng District is currently planning the only national ports in the second category.

     After the completion of the Chancheng port area is not only an important part of Foshan port, it will become a set of "Hong Kong, garden, field, warehouse," four is located in one of the modern port logistics base. "Hong Kong" port and "garden" is refers to the industrial park, Foshan hi tech Industrial Development Zone, "field is the container car market," warehouse "is bonded warehousing and logistics warehouse.

      The opening of the Chancheng port, the Foshan port, the way of the Chinese and Western Avenue, and the way to build a traffic net. In addition, Chancheng Foshan hi tech Industrial Development Zone, adjacent to the South China Sea Shishan, Luo village, a small pond, Xiqiao, Lecong, Shunde, the rapid transit system to the port and the surrounding economic city into a 10 minute economic circle".

    According to the plan, Foshan City will use 15 years, built to "two vertical and three horizontal" channel for the skeleton, three hills, Sanshui, Jiujiang, Gaoming, Rongqi, Beijiao, Leliu, Chancheng eight important port as the backbone, waterway network unobstructed, port layout reasonable, connecting inland, Jianghai, extending in all directions waterway system. In the future, Foshan port will gradually be collectively referred to as Foshan port, the existing port terminal resources will gradually transition, or timely relocation, or continue to expand the scale, according to the plan after the integration is conducive to enhance the visibility of Foshan port. According to the forecast, in 2010 the amount of water transport can reach 67000000 tons, accounting for 36.2% of total social freight.

Back

Address:Room 703,TianYu Business Plaza(East Tower),No.753 DongFengDong Road,Guangzhou 510080,China
Tel:020-88260018 88260028 88260038    Fax:020-38309400   Email:info@qg-shipping.com  
Copyright© 2015-2020 Guangzhou QG International Shipping Co.,Ltd 粤ICP备 20017718号 SupportQQ:1611944611

Total Visit: Today Visit: Month Visit:

On Line Service

Tel

020-88260018 88260028 88260038

关注广州泉港国际货运代理有限公司